This topic thread is for any issues with turns that you are having, such as garbled printouts, etc. should be posted here. This will help us address problems and glitches with email, etc. We will also post suggestions here for fixes to specific issues.
This is not a gripe board, this is a troubleshooting board. Don’t just say “My turn didn’t work.” be as specific as possible. That way we can work together to fix the issue and make the game better for everyone.
	Moderator: Tregonsee
	
		
		
			
			
			 by ImperiumLafayette » Sun Feb 10, 2019 8:21 am
by ImperiumLafayette » Sun Feb 10, 2019 8:21 am 
			
			Rift Attack Transport (RAT1) cost:2750 TL:32
Assault Transport 2, Rift (RAT2) cost:750  TL:36
Assualt Transport 3, Rift (RAT3) cost:4200  TL:38
Aside from the fact the naming is inconsistent, the cost listed in the tech sheets for RAT2 must be incorrect as it is actually lower than the RAT1. As I haven't ever built one I don't know what the actual price might be. Best Guess would be 3750.
			
		 
		
			
			- 
				 
 ImperiumLafayette
-  
- Posts: 133
- Joined: Tue May 22, 2018 4:06 pm
 
	 
	
	
		
		
			
			
			 by Framis » Sun Feb 10, 2019 10:18 am
by Framis » Sun Feb 10, 2019 10:18 am 
			
			Check the turn printout. They are named correctly and have costs that seem right.
The tech sheets seem to have quite a few inconsistent entries.
			
		 
		
			
			- 
				 
 Framis
-  
- Posts: 87
- Joined: Sun Oct 09, 2016 4:47 pm
 
	 
	
	
		
		
			
			
			 by CHARON EMPIRE » Tue Feb 12, 2019 7:10 pm
by CHARON EMPIRE » Tue Feb 12, 2019 7:10 pm 
			
			Maybe this helps if you don't have the tec:
RAT1     Rift Attack Trans1    1950      32    2   250 MARINES  
RAT2     Rift Attack Trans2    2800      36    3   400 MARINES 
RAT3     Rift Attack Trans3    3900      38    4   600 MARINES
			
		 
		
			
			- 
				 
 CHARON EMPIRE
-  
- Posts: 192
- Joined: Tue Aug 19, 2014 4:04 pm
 
	 
	
	
	
	Return to Troubleshooting Board
	
	Who is online
	Users browsing this forum: No registered users and 1 guest